A leader in environmental and engineering consultancy

We make the most of our customer’s assets. We value human resources and install programs for capability building.

We Rethought Everything

Complete Corporate Identity

Completed Projects Handled by Greenlex

  • Electrolytic Wastewater Treatment Facility. The electrolytic wastewater treatment system is a product developed in the Philippines by Greenlex  engineers with installations at the following business establishments:
    • Toyota Manila Bay  – King Sue Ham and Sausage Corporation
    • Toyota Dasmariñas  – Quick Serve (KFC BF Homes)
    • Jollibee Sta. Quiteria  – San Lorenzo Ruiz Hospital
    • Harmonic Seven Inc.( Jollibee –Halcon)  – St. Martin Hospital
    • Green Resource & Environmental Management Solutions, Inc.
    • Quick Serve (KFC Fatima)  –  University of San Carlos ( Cebu City )
 

  • Design and installation of 350 BHP capacity flow gas wet scrubber – Pepsi Ilo-ilo.
  • Design of physio-chemical treatment facilities and biological wastewater treatment systems (560 cubic meters per day capacity) – Far East Fuel Corporation.
  • Design, installation, commissioning of consumer chemical processing facilities – S.C. Johnson & Son.

Completed Electrolytic Wastewater Treatment Projects

  • Cuneta Astrodome – Pasay City
  • Doña Nena Health Center – Pasay City
  • Malibay Health Center – Pasay City
  • University of San Carlos – Cebu City
  • Toyota – Manila Bay
  • Toyota – Dasmariñas
  • Saint Clare Hospital – Makati City
  • Harmonic Seven Inc.(Jollibee –Halcon)
  • St. Martin Hospital – Rosario, Cavite
  • Green Resource & Environmental Management Solutions Inc. – San Pedro, Laguna
  • Lemery Doctors General Hospital – Lemery, Batangas
  • Quick Serve (KFC BF Homes/KFC Fatima)
  • King Sue Ham and Sausage Corporation – Caloocan City
  • Crisostomo General Hospital – Bacoor City
  • Bel Mondo Italia – Cabuyao, Laguna
  • Tri-Bloc (Dunkin Donut Commissary) – Taytay, Rizal

Completed Projects Involving GREENLEX Personnel

  • Physico-chemical Treatment Plants
  • Operation Management of Thermal Oxidizer
  • Encapsulation/Stabilization/Solidification Facility
  • Materials Recovery/Security Destruction
  • Laboratory:
  • Biological Waste Water Treatment Plant
  • Activated Sludge Facility
  • Solvent Recovery
  • Design of meat processing plant – Dalisay Farms
  • Upgrading of manufacturing facilities and systems installation– Lorenzo Reyes Laboratories
  • Upgrading of manufacturing facilities and systems installation – Golden Dragon Marine Products.
  • Other projects in the metals, food, petroleum, vessel maintenance, etc.
  • Design, installation, and commissioning of S.C. Johnson & Son consumer chemical processing facilities

Cell Site Tower Projects

  • Tower Installation/Erection
  • Three or Four-legged Tower for Telecommunications, power, transmission, poles & telecom musts of similar nature.

Radio Frequency Transmitter Integration

  • Base Transceiver Station Installation
  • Rectifier Installation
  • Energization of ACPDB/TVSS
  • Fiber Optic Pulling/Splicing and Termination
  • Indoor Building Solutions

Completed Projects Involving GREENLEX Personnel

  • Wet Scrubber Systems
  • Electrolytic Waste Water Treatment Facilities
  • Physico-chemical Treatment Plants
  • Encapsulation/Stabilizzation/Solidification Facility
  • Materials Recovery/Security Destruction
  • Laboratory:
    • Biological Waste Water Treatment Plant
    • Activated Sludge Facility
    • Solvent Recovery
 

  • Design of meat processing plant – Dalisay Farms
  • Upgrading of manufacturing facilities and systems installation– Lorenzo Reyes Laboratories
  • Upgrading of manufacturing facilities and systems installation – Golden Dragon Marine Products.
  • Other projects in the metals, food, petroleum, vessel maintenance, etc.

Completed Full-Scale Wet Scrubber Projects

  • Pepsi Plant – Iloilo City
  • Pepsi Plant – Cagayan De Oro City
  • Pepsi Plant – Bacolod City
  • Pepsi Plant – Cebu City
  • Pepsi Plant – Santo Tomas, Batangas
  • Pepsi Plant – Tanauan, Leyte

Toxic and Hazardous Waste Management Industry/ Printing Ink Industry / Waste/Water Treatment Industry / Garment Industry / Personal Care and Household Industry

  • System Management
  • Regulatory/Compliance Obligation
  • Process Engineering
  • Government/Community Relation
  • Research and Development
  • Quality Assurance/Control
  • Operation and Maintenance
  • Color Matching, Quality Control
  • Good Manufacturing Systems/Practices
  • PCO Reports
  • EIA Preparation

Petrochemical Projects

  • LPG Plant
  • LNG Plants
  • Gas Plants
  • Gas Refinery
  • Methanol Plant
  • Silicon Manufacturing Plant

Architectural Design and Build

  • 500 Bed Capacity Hospital
  • 12-Storey Building Façade and Glass Wall System
  • 15-Storey Building Edifice and Exterior LED Lighting System
  • Video Wall and Parking Systems
  • Interior Video Wall System
  • Exterior Video Wall System
  • Residential/Commercial Urban Planning